S/N |
PROJECT
DESCRIPTION |
CLIENT |
PROJECT
LOCATION |
DURATION |
STATUS |
1 |
Berge balancing: LOAD OUT OPERATION OF 1971/1 MEJI HELIDECK |
DORMANLONG |
NIGERIAN NAVAL DOCK YARD V/L LAGOS |
Scheduled for January 2013 |
IN PROGRESS |
2 |
Construction of Polypropylene tanks by armored reinforced fiber glassed water tanks OD 10,0000 liters capacity each |
TOTAL E & P |
OBAGI |
April 2012 – March 2013 |
IN PROGRESS |
3 |
Berge balancing: LOAD OUT OPERATION OF EXONMOBIL’S OYOT WELLHEAD PLATFORM |
DORMANLONG - EXXONMOBIL |
NIGERIAN NAVAL DOCK YARD V/L LAGOS |
3 Weeks |
CLOSED |
4 |
PIGGING OF 18” BY 47KM ASA-RUMUEKPE TRUNKLINE USING MECHANICAL PIGS |
CHENOTEC -SPDC |
ASA PIGGING MAZNIFOLD |
|
CLOSED |
5 |
Procurement of pipe fittings,etc |
KAZTEC ENG.LTD |
ADDAX FIELD |
April 2011 |
IN PROGRESS |
6 |
Construction of perimeter Chainlink fencing:
Mob/demob of Equipment & personnel,Survey/setting out,Footing Excavation & concrete works,Angle iron post,Galvanised Chainlink Mesh& barbe wire installation.,site clean up. |
TOTAL E & P |
OBAGI |
3 MONTHS |
CLOSED |
7 |
Flow line inspection/Blasting and painting of corroded sections,Ultrasonic wall thickness test to ascertain the remaining wall thickness of
the flowlines |
SUNTERA |
EDO STATE |
6 Months |
CLOSED |
8 |
Ultrasonic wall thickness test on STORAGE TANKS |
NLNG |
PHC BASE |
2 Months |
CLOSED |
9 |
Hydro testing and pipeline cleaning/pigging of 10” |
SPDC (Subcontract) |
OBIGBO GAS PLANT |
1 Month |
CLOSED |
10 |
Location preparations,etc for drilling and support services |
SUNTERA/summit OIL |
OTEN FIELD |
March 2008 |
CLOSED |
11 |
Deep water wells for drilling locations and camp sites |
SUNTERA |
BENIN |
March 2008- |
CLOSED |
12 |
Prcurement,certification of valves,etc |
WAVENTURES (SEATRUCKS) |
AFRENFIELD |
DEC, 2008-FEB.,2009 |
CLOSED |